Kuching
24.4°C
CloudyCloudy
Samarahan
25.2°C
FogFog
Serian
24.4°C
FogFog
Betong
22.1°C
FogFog
Sri Aman
24.1°C
FogFog
Sibu
24.2°C
Partly cloudyPartly cloudy
Mukah
22.6°C
FogFog
Sarikei
24.3°C
Partly cloudyPartly cloudy
Bintulu
23.2°C
Light drizzleLight drizzle
Kapit
22.2°C
Light rainLight rain
Miri
24°C
Partly cloudyPartly cloudy
Limbang
24.1°C
Partly cloudyPartly cloudy
|
13 Jun 2026
Muara Lassa Bridge Opens Second Longest Bridge in Sarawak Ready for Use

Muara Lassa Bridge Opens: Second Longest Bridge in Sarawak Ready for Use

DARO (Jan 9): The much-anticipated 2.43km Muara Lassa Bridge, Sarawak’s second-longest bridge, is now officially open to the public. The bridge, a key milestone in the state’s infrastructure development, marks another achievement by the Gabungan Parti Sarawak (GPS) government.

- Promotion -
UDC Event 2026

Deputy Minister of Infrastructure and Ports Development, Datuk Aidel Lariwoo, announced the completion of the bridge during a pre-launch ceremony. Representing Deputy Premier Datuk Amar Douglas Uggah Embas, he expressed his gratitude for the smooth construction process, which took 48 months to complete.

Ads
Muara Lassa Bridge Opens Second Longest Bridge in Sarawak Ready for Use
Muara Lassa Bridge Opens Second Longest Bridge in Sarawak Ready for Use / Photo Credit: UKAS

“This bridge is not only a symbol of connectivity but also a testament to high-quality construction and efficient planning,” Aidel said.

He also shared that a two-lane road linking the bridge to Daro town has been approved and will soon be constructed, further enhancing accessibility for residents and travelers.

Ads

<strong>Part of a Larger Coastal Development Plan</strong>

The Muara Lassa Bridge is one of 16 bridges constructed under Sarawak’s coastal and second trunk road projects. These projects aim to transform the state’s connectivity and boost its economic development.

Datuk Aidel highlighted the RM12 billion cost of the coastal roads and bridges, fully funded by the Sarawak government through alternative financing methods. He credited the wisdom of Premier Datuk Patinggi Tan Sri Abang Johari Tun Openg for adopting this approach, which accelerated progress significantly.

Ads

“If we had followed conventional financing methods, many of these projects might still be pending,” Aidel remarked.

<strong>Upcoming Infrastructure Milestones</strong>

In addition to the Muara Lassa Bridge, several other bridges are set for completion this year, including the Bintulu-Jepak Bridge in February and the Pasi Bridge in March. Overall, the coastal road project has reached 80% completion, while the second trunk road stands at nearly 30%.

Ads

The official opening ceremony of the Muara Lassa Bridge by the Premier is scheduled for February 22.

<strong>Key Figures Present</strong>

Notable attendees at the event included Deputy Minister of Corporate Affairs Datuk Abdullah Saidol, Igan MP Ahmad Johnie Zawawi, Tanjung Manis MP Yusuf Abd Wahab, Daro assemblyman Safiee Ahmad, and Sarawak Public Works Department director Ir Dr Cassidy Morris.

Ads
Ads

By Minul Islam Rony

Is a local journalist, dedicated to delivering accurate, timely, and community-focused reporting. He covers breaking stories, public affairs, and local developments that matter most to readers. As the CEO and PR Manager of Sarawak Daily, he also oversees editorial direction, strategic communication, and partnerships, ensuring the platform remains a trusted source of news for the region.