Kuching
25°C
Moderate or heavy rain with thunderModerate or heavy rain with thunder
Samarahan
31°C
Patchy rain nearbyPatchy rain nearby
Serian
25°C
Moderate or heavy rain with thunderModerate or heavy rain with thunder
Betong
29.1°C
MistMist
Sri Aman
29.1°C
Patchy rain nearbyPatchy rain nearby
Sibu
30.3°C
Partly cloudyPartly cloudy
Mukah
30.3°C
Partly cloudyPartly cloudy
Sarikei
30.3°C
Partly cloudyPartly cloudy
Bintulu
30.2°C
Light rain showerLight rain shower
Kapit
25.8°C
Patchy rain nearbyPatchy rain nearby
Miri
31.3°C
Partly cloudyPartly cloudy
Limbang
31.2°C
Partly cloudyPartly cloudy
|
3 Dec 2025
Partial Road Closure at BDC Flyover in Kuching from Aug 30 to Sept 10

Partial Road Closure at BDC Flyover in Kuching from Aug 30 to Sept 10

Kuching’s BDC Flyover to Experience Temporary Road Closure

Partial Road Closure at BDC Flyover in Kuching from Aug 30 to Sept 10
Partial Road Closure at BDC Flyover in Kuching from Aug 30 to Sept 10

KUCHING, Aug 30 – The Sarawak Public Works Department (JKR) has announced a significant traffic update affecting the BDC Flyover in Kuching. From today, August 30, until September 10, a portion of the BDC Flyover will be partially closed to facilitate essential resurfacing works.

Why the Road Closure is Necessary

Resurfacing Works for Enhanced Safety and Durability

The primary reason behind this temporary road closure is to carry out crucial resurfacing works. These upgrades are expected to improve the road surface, enhancing safety and durability for all users. The Sarawak JKR assures that these improvements are necessary for maintaining the flyover’s structural integrity and overall traffic safety.

Impacted Road Section

The road closure will affect the section between Jalan Tun Jugah and Jalan Lapangan Terbang Kuching. Commuters using this route should anticipate delays and plan alternative routes accordingly.

What Road Users Need to Know

Alternative Routes and Traffic Management

During the closure, traffic management measures will be in place to minimize disruptions. Road users are encouraged to follow the temporary traffic signs and signals posted in the area to ensure smooth traffic flow and safety.

Alternative Routes:

  • From Jalan Tun Jugah: Drivers should consider using Jalan Kulas and Jalan Stutong as alternate routes.
  • From Jalan Lapangan Terbang Kuching: Access via Jalan Canna and Jalan Stapok can help bypass the affected area.

Public Inquiries and Contact Information

For those needing more information or assistance regarding the road closure and traffic management, the Kuching Division JKR office is available to help. Contact the following personnel during office hours:

  • Nurul Athirah or Rani: 082-203400
  • Roy: 013-2243050

Safety First: Tips for Commuters

  • Plan Your Journey: Allow extra time for your travel to account for potential delays.
  • Follow Signage: Adhere to all temporary traffic signs and signals placed around the construction zone.
  • Drive Cautiously: Be aware of changing road conditions and reduced visibility around the construction site.

Conclusion

The temporary partial road closure at the BDC Flyover is a necessary measure to ensure long-term improvements to the road’s surface and safety. By planning ahead and staying informed, road users can navigate the affected area with minimal inconvenience. For real-time updates and further details, keep an eye on local news channels and the Sarawak JKR announcements.

By Minul Islam Rony

Is a local journalist, dedicated to delivering accurate, timely, and community-focused reporting. He covers breaking stories, public affairs, and local developments that matter most to readers. As the CEO and PR Manager of Sarawak Daily, he also oversees editorial direction, strategic communication, and partnerships, ensuring the platform remains a trusted source of news for the region.